Our charging hubs
Our charging network is designed with the customer in mind. Fast, reliable, and accessible – experience the future of electric mobility at every site.
At our hubs you can find some of the highest power outputs available today, up to 400 kW CCS chargers. We also plan a swift transition to Megawatt Charging System (MCS) technology as soon as it becomes available, paving the way for charging speeds of up to 1,000 kW. This means long-haul trucks can be fully charged in just 30-45 minutes.
Open Q2 2024
Belgium
Antwerp
To be confirmed
Belgium
Ghent
OPEN Q3 2024
Sweden
Varberg
OPEN Q3 2024
Sweden